This week is the last week before winter break. In this week I began putting the finishing touches on library buildings. This includes making sure the visual aspects are there. It also includes adding the electrical fixtures to both floors. In the second floor, Revit will not allow me to place any switches or outlets. I improvised and connected the wires to a point on the wall where I would want the switch or outlet to go. I have to fix the lights on the first floor so that they are attached to the ceiling. This is an easy fix. My next move is to do the same process with the cafe building. I hope to began this process after winter break.
|